top of page
End Truck Replacement
CP&A was retained to furnish the structural and mechanical drafting, and fabrication support services for the replacement of an end truck bogey system on a set of overhead cranes. The original end trucks had failed early in the life of the cranes due to a design issue. The overhead cranes were able to be put back into operating immediately upon installation and load testing of the new end trucks.
bottom of page