top of page
Vibration Array for Piledriving.

Bridge Traveller

Under bridge maintenance investigation.

Bridges require preventive and regular maintenance as part of their structural inspection program. Bridge travelers help workers access critical areas of a bridge in order to carry out the inspection and repair work without impacting the flow of traffic.


This bridge traveler experienced a failure of one of the underhung trucks. CP&A was contracted by American Crane and Equipment Corporation (ACECO) to perform engineering services related to repair, root cause, and modification of the bridge traveler.


CP&A performed finite element analysis in order to evaluate the adequacy of the existing traveler structure and retrofit it with a more robust end truck and propulsion system. Additionally CP&A traveled to ACECO's facility to assess the structure.

Project Gallery

bottom of page