Boeing Everett Complex Seismic Upgrade

Home
Contact US

JOB OPPORTUNITY
HISTORY
MISSION
CRANE SERVICES
STRUCTURAL DESIGN
SEISMIC DESIGN
OTHER SERVICES
SOFTWARE
FEATURED PROJECTS
CLIENT LIST
STAFF
PUBLICATIONS*
   

 

 

CP&A was retained to design a system to improve the seismic performance of Boeing’s main assembly building complex at the Everett site. By volume this is the world's largest building. CP&A worked with Austin, Dames & Moore, and Boeing to develop acceptance and design criteria.

Non-Linear dynamic Time-History (NLTH) analysis was used to design the rehabilitation which included installation of friction dampers on the second story braced frames. Multiple rehabilitation schemes were investigated, with friction damper scheme proving least disruptive and most economical. Custom software was developed to automate member and connection checks due to the large quantity of analysis output and the size of the time-history analysis.

Corporate Office:

6830 19th Street West, Tacoma, Washington 98466, USA

Phone: (253)627-7400, Fax: (253)627-4715, Email: casperph@cranedesign.com

Home | JOB OPPORTUNITY | HISTORY | MISSION | CRANE SERVICES | STRUCTURAL DESIGN | SEISMIC DESIGN | OTHER SERVICES | SOFTWARE | FEATURED PROJECTS | CLIENT LIST | STAFF | PUBLICATIONS*