CP&A was retained as responsible engineers for the SEA-TAC airport parking
garage earthquake damage inspection and repair concept. This includes concrete floor,
curbs/walks, concrete ceiling, concrete column, seismic
expansion joint, and crack and joint repair.
Corporate Office:
6830 19th Street West, Tacoma, Washington 98466, USA