Please use Internet Explorer to avoid display compatible issue for this WebsitePlease use Internet Explorer to avoid display compatible issue for this Website

 

 

 

 

 

Boeing North Field Seismic Repair

Home
Contact US

JOB OPPORTUNITY
HISTORY
MISSION
CRANE SERVICES
STRUCTURAL DESIGN
SEISMIC DESIGN
OTHER SERVICES
SOFTWARE
FEATURED PROJECTS
CLIENT LIST
STAFF
PUBLICATIONS*
   

 

 

The 2001 Nisqually Earthquake severely damaged the Boeing Company’s auditorium and cafeteria building. Many of the foundation to column base connections were dragged down due to soil liquefaction.  Some lateral bracings were yielded and buckled.

CP&A developed a reliable and efficient repair scheme that also covered future potential major earthquakes.

Non-Linear Time History (NLTH) analysis was used to size friction dampers, and to simulate response for several different design earthquake records.

Corporate Office:

6830 19th Street West, Tacoma, Washington 98466, USA

Phone: (253)627-7400, Fax: (253)627-4715, Email: casperph@cranedesign.com

Home | JOB OPPORTUNITY | HISTORY | MISSION | CRANE SERVICES | STRUCTURAL DESIGN | SEISMIC DESIGN | OTHER SERVICES | SOFTWARE | FEATURED PROJECTS | CLIENT LIST | STAFF | PUBLICATIONS*